Project Detail

THIEN TAN WATER FACTORY

Project

  • Customer: ĐỒNG NAI
  • Location: ĐỒNG NAI
  • Scale: 1200 billion VNĐ
  • Time: 04/2014

The project to build the Thien Tan water supply system phase 2 has a capacity of 100 thousand m3/day and night, 2 times more than the Thien Tan water supply system phase 1.

This is an investment project within the urban water supply planning of Dong Nai province for the period up to 2020, with a vision to 2050. The project has an investment capital of more than 1.2 trillion VND (61 million USD), of which Korea's ODA loan is 41 million USD. Contractor Dowha (Korea) is responsible for design consulting and project supervision; Contractor Kumho - Industrial Co., Ltd is a construction and installation unit and equipment supplier with the following items: Installation of 4,380m3/hour raw water pump; water treatment plant with capacity of 100,000 m3/day and night; 22 km long transmission pipeline network; booster pump station with capacity of 51,000 m3/day and night...BEN Joint Stock Company is the construction unit of factory tank systems: Sedimentation tanks, Storage tanks, filter tanks...with Main volume: Pouring more than 12 thousand m3 of concrete concrete, fabrication and erection of more than 1,200 tons of steel, and installation of 33,000 m2 of formwork.

Images of Construction Projects