The My Luong-Tan My Bridge project has a permanent concrete structure, over 371m long; 8m wide with 2 lanes; load capacity 15 tons; Navigation clearance is about 7m vertically, 30m horizontally; The road leading to both ends of the bridge is 591m long.
BEN Joint Stock Company is the direct construction unit of the entire bridge and road package at both ends of the bridge.