No 12, Lucky Dragon Residential Area, Street 357, Phuoc Long B Ward, Thu Duc City, Ho Chi Minh City
Contact: +84-(028)-3620-1898
Operating hours T2 - T7: 8:00 - 18:00
Project Detail
DONG NAI RIVER Embankment
Project
Customer: BEN Joint Stock Company
Location: Đồng Nai
Scale: 1 km
Time: 04/2015
With the Dong Nai River embankment project, BEN Joint Stock Company is the unit directly constructing nearly 1 km of embankment with concrete sheet pile structure, the inside of the sheet pile wall is anchored with D800 bored piles.