Project Detail

AN HẢO Bridge

Project

  • Customer:
  • Location:
  • Scale: 1.000 tỉ đồng
  • Time: 12/2015

An Hao Bridge started construction on December 30, 2015, spanning Dong Nai River (section passing An Binh Ward and Hiep Hoa Commune, Bien Hoa City)

The bridge is designed with a total length of 2,153m, including a bridge section 475m long, 23m wide for 6 lanes of traffic, the remaining is the road leading to the bridge. The bridge is in an additional item of the new Dong Nai bridge construction project. and the 2 ends of the bridge are invested by Construction Corporation No. 1 (CC1) in the form of BOT (build - operate - transfer). Total construction capital is over 1,000 billion VND. BEN Joint Stock Company is the construction unit of all piles, abutments, and pillars on the bank of Binh An Ward

Images of Construction Projects

The project does not have any images!